Rebuilding, three years on
The 2022 storm surge reached deep into Iona, and a fair number of houses here are still being rebuilt rather than merely repaired. An Iona rebuild is a long placement, running through demolition, structure, mechanical and finish, and it holds a fixed weekly service for the whole of that.
Contractors working several Iona addresses at once want them logged together on one route day. That keeps an Iona driver from crossing the same few streets twice in a week to reach two jobs a quarter mile apart.
Canal frontage, docks and lifts
The canal network through Iona keeps marine trades busy replacing docks, seawall caps and boat lifts. An Iona marine placement stands at the street end of the drive, because the ground within a few meters of a seawall is worked, wet and quite unable to carry a loaded hose.
Elevated houses are increasingly common across Iona as rebuilds go up higher than the originals. That changes where a unit belongs too, and we set an Iona placement clear of the piling area where the crew still passes it several times a day.
Low ground, salt air and access
Iona sits low and close to the bay, so ground water is near the surface and the soil stays damp well into the dry season. An Iona placement belongs on the drive or a shell pad, and set there it holds level right through the wet months.
Salt carries in off the water across the whole of Iona, and it works on hinges and latches faster than anything inland. We check fittings at every Iona service visit and swap units on a shorter cycle than we would further east.
