Yards, depots and long-term placements
The industrial side of Tice is what keeps this route busy, with haulage yards, plant depots and repair shops along the boulevard and the roads behind it. A Tice yard holds a standing standard unit and a handwashing station on the concrete near the shop, because drivers and mechanics use it from first light onward.
Those Tice placements are on twice-weekly service from the outset. A Tice depot with twenty people through the gate each day uses a unit far harder than a house build, and a single weekly visit does not hold up.
Older housing and continuing repairs
Housing across Tice is older and modest, and the work here is repair, replacement and small infill rather than new subdivisions. A Tice re-roof or interior rebuild takes one standard unit at the front of the drive, sited opposite the dumpster so the tipper has room. Frontages on the older Tice streets are narrow enough that the placement gets agreed before the dumpster is even dropped.
Work from the 2022 storm season is still being completed on a number of Tice properties. Those Tice placements run long and quiet, holding a fixed Monday service until the repair finally signs off.
Boulevard traffic and creek-side ground
Palm Beach Boulevard carries heavy traffic through Tice from first light, so delivery timing genuinely matters. We route Tice drops mid-morning, which keeps a loaded truck out of the commuter flow and gets the driver clear space at the gate. Yard gates along the Tice boulevard are busiest at shift change, and a delivery landing then simply waits.
The creeks running through Tice keep the low ground damp well past the end of the rains. A Tice placement belongs on concrete, shell or the drive, and set there it holds level right through the summer.
